A data hall is an air handling problem with an unusually clear specification: remove this many kilowatts, deliver air at this inlet condition. The load is almost entirely sensible, the humidity limits are published, and the designer controls the temperature rise across the equipment. That makes the arithmetic of airflow very simple, and the energy consequences very large.

This guide sets out the airflow-per-kilowatt relationship, shows what a wider temperature rise does to fan energy, and converts the ASHRAE TC 9.9 humidity limits into relative humidity at different inlet temperatures.

The short version

  • A 100 kW IT load needs about 8.28 m³/s with a 10 K temperature rise across the equipment, and 5.52 m³/s at 15 K. That is 298 and 199 m³/h per kW.
  • Fan power varies with the cube of airflow, so going from 10 K to 15 K cuts fan power to about 30% of the original.
  • ASHRAE TC 9.9’s recommended envelope for classes A1 to A4 is 18 to 27 °C at the equipment inlet, with a dew point from −9 °C to 15 °C and a maximum of 60% RH.[1]
  • Containment, sealing and matching airflow to server demand are what make a wide temperature rise achievable.

Airflow per kilowatt

Nearly all of the electrical power a server draws becomes heat in the airstream, and the airflow needed is the same sensible-heat formula used for any room: load ÷ (ρ × cp × ΔT). Here ΔT is the temperature rise across the IT equipment, not the supply-to-room difference of an office.

Temperature rise across IT (K)Airflow for 100 kW (m³/s)Airflow for 100 kW (m³/h)m³/h per kWFan power relative to a 10 K designFan power if the 10 K case is 10 kW (kW)
108.2829,821298100%10.0
126.9024,85124958%5.8
155.5219,88119930%3.0
204.1414,91114912%1.2

A 10 K rise takes about 298 m³/h for every kilowatt, and a 20 K rise about half that. The last two columns use the fan law: power varies with the cube of flow. A hall designed for 15 K needs two thirds of the air and, in principle, under a third of the fan power. That is why fan energy is the first thing a data centre designer tries to cut, and the main reason containment is worth paying for.

What stops you using a wider rise

  • Air that is not where it should be. If cold supply air mixes with hot return air, the equipment sees warmer inlet air than intended and the rise falls. Containment of the hot or cold aisle, blanking panels and sealed floors fix the mixing.
  • Server demand. Server fans speed up as inlet air warms, and their own power rises sharply. There is a point where a warmer room costs more in server fan power than it saves in cooling.
  • The room volume. Equipment with a low airflow per kW needs a wider rise to cool, so the mix of equipment matters.
  • The recommended inlet limit. The air entering the equipment must stay inside the recommended range for the class.

The ASHRAE TC 9.9 envelope

ASHRAE’s Thermal Guidelines for Data Processing Environments set a recommended envelope for equipment classes A1 to A4: 18 to 27 °C dry bulb at the inlet, with a dew point from −9 °C to 15 °C and a maximum relative humidity of 60%. For class A1 the allowable range is wider, 15 to 32 °C, with dew points from −12 °C up to 17 °C and 80% RH, and class A4 extends to 5 to 45 °C and 24 °C dew point with 90% RH.[1]

The limits are given in dew point because that is what matters for condensation and static, as we explained in the dew point guide. Operators think in RH, so the table converts the recommended dew point range into the RH band at each inlet temperature.

Inlet temperature (°C)RH at the −9 °C dew point (%)Upper RH limit: lower of 60% and the 15 °C dew point (%)
181560
221260
241057
27948

At 18 °C the 15 °C dew point limit is about 83% RH, so the 60% maximum is the binding upper limit. At 27 °C the 15 °C dew point is about 48% RH, which is lower than 60%, and becomes the binding limit. The warmer the inlet air, the narrower the permitted humidity band. The RH values are our calculation from the published dew point limits.

Fan energy in context

Because fan power follows the cube of airflow, the biggest data centre savings come from matching airflow to what the servers actually need, rather than running fans at a fixed rate sized for the worst case. Variable speed fans controlled on differential pressure across the aisle, or on inlet temperature, let the airflow track the load. The pressure budget that sets the fan duty is built up in the fan power article, and the same cube law explains why oversizing the unit and throttling it is such an expensive way to cool.

What it means for the AHU

  • Specify the supply condition as temperature plus dew point, and say where it is measured: at the server inlet, not the unit.
  • Size the airflow from the IT load and the design temperature rise, as in from cooling load to airflow, then confirm the unit’s turndown, because load grows in stages.
  • In a humid climate, check that outdoor air or leakage will not push the dew point above the 15 °C limit, which is a few degrees above what a chilled water coil leaves.
  • Use energy recovery only where it cannot add moisture to the supply. The trade-offs are in the energy recovery article.
  • Plan the filtration: the particle limits are as important as temperature for reliable equipment, and the staging is in our data center air purification guidance.

Where this fits with NextAir

NextAir builds air handling units for data halls and technical rooms from 1,000 to 30,000 CMH per unit, with multi-unit arrangements above that for N+1 redundancy. Send the IT load, temperature rise and inlet condition to our air handling unit manufacturer team. See our data centers page and the AHU guide.

Sources

  1. ASHRAE TC 9.9. Thermal Guidelines for Data Processing Environments, 4th ed., Table 2.1 (2015 guidelines, SI).
  2. NOAA. Fast Facts: highest dew points and heat index.

Figures and tables on this page are calculated or compiled by NextAir Systems and you are welcome to reuse them with a link back to this article.

Frequently Asked Questions

How much airflow does a data centre need per kilowatt?

About 298 m³/h per kW at a 10 K temperature rise, 199 m³/h at 15 K and 149 m³/h at 20 K.

Why does a wider delta-T save so much energy?

Because it needs less air, and fan power varies with the cube of airflow. A 15 K design needs two thirds of the air of a 10 K design and under a third of the fan power.

What is the ASHRAE recommended inlet temperature for servers?

For classes A1 to A4, 18 to 27 °C, with a dew point from −9 °C to 15 °C and a maximum of 60% RH.

Is the recommended envelope mandatory?

No. It is a guideline, and the allowable ranges are wider. Equipment manufacturers' warranties and your own risk assessment decide what you operate to.

Why is the humidity limit stated as a dew point?

Because dew point describes the actual moisture in the air and does not change with temperature, which is what matters for condensation and electrostatic discharge.