Air handling units are specified by airflow, and airflow comes from a cooling load. Between the two there is one equation and one design choice, and most sizing mistakes live in the choice. Get it right and the unit, the ducts and the fan are all sensibly sized. Get it wrong and everything downstream is oversized or short of capacity.
This guide works from a room load to an airflow, then checks the humidity, which is the part usually forgotten. The numbers are an example, so substitute your own.
The short version
- Airflow = sensible load ÷ (air density × specific heat × supply-to-room temperature difference). For a 60 kW sensible load and a 10 K difference, that is 4.97 m³/s, or 17,893 m³/h.
- The supply temperature difference is a design choice. A wider difference means less air, smaller ducts and less fan energy, but a colder coil and a risk of condensation or draughts.
- The latent load sets the supply air’s moisture. With 12 kW of latent gain, the supply must be at about 11.6 °C dew point or lower to hold the room at 24 °C and 50% RH.
- Outdoor air adds to both loads, and in a humid climate it dominates the latent one.
Step 1: airflow from the sensible load
Sensible heat raises air temperature. The air that removes it must arrive colder than the room, so the airflow is the load divided by the heat each cubic metre can carry away: ρ × cp × ΔT, with ρ about 1.2 kg/m³ and cp about 1.006 kJ/kg·K.
Worked example. A room has 60 kW of sensible heat gain. It is held at 24 °C and supplied at 14 °C, so ΔT is 10 K. Airflow = 60 ÷ (1.2 × 1.006 × 10) = 4.97 m³/s = 17,893 m³/h. That sits inside the 1,000 to 30,000 CMH range of a single AHU, so one unit will do.
| Supply ΔT (K) | Supply temperature (°C) | Airflow (m³/s) | Airflow (m³/h) | Duct area at 8 m/s (m²) | Airflow per kW of load (m³/s) |
|---|---|---|---|---|---|
| 8 | 16 | 6.21 | 22,366 | 0.78 | 0.10 |
| 10 | 14 | 4.97 | 17,893 | 0.62 | 0.08 |
| 12 | 12 | 4.14 | 14,911 | 0.52 | 0.07 |
| 14 | 10 | 3.55 | 12,780 | 0.44 | 0.06 |
Widening ΔT from 8 to 14 K cuts the airflow from about 6.2 to 3.6 m³/s, a reduction of 43%. The duct shrinks with it, and so does the fan energy, which falls faster than the airflow does. The price is a colder supply, which brings its own risks.
Step 2: choose the supply temperature difference
- Comfort spaces: a wide ΔT can cause cold draughts at the diffusers unless they are designed for it. Many designs use 8 to 10 K.
- Process and equipment rooms: a wider ΔT is common, as in data centre airflow, because there is no one to feel the draught.
- Humid climates: a cold supply helps dehumidify, but it must stay above the point where the ductwork sweats. Check the dew point of the plant room against the duct surface temperature.
- Existing ducts: the ductwork you have may limit the airflow, which sets the ΔT you need.
Step 3: check the humidity
The airflow from step 1 is set by the sensible load. The supply air must also carry away the room’s moisture, and that sets how dry it has to be. A latent gain of 12 kW is 17.6 kg/h of water. At the airflow above, the dry air mass flow is 5.96 kg/s, so the supply must be drier than the room by 0.82 g/kg.
The room at 24 °C and 50% RH holds 9.30 g/kg. The supply must therefore be at 8.48 g/kg or less, which is a dew point of 11.6 °C. Here is the catch. Air leaving a coil at 14 °C and 95% RH has a dew point of 13.2 °C, which is too humid, and the room would drift above 50% RH. To get under 11.6 °C the coil has to leave the air at about 12 °C near saturation, a dew point of 11.2 °C. That means a 12 K difference, and an airflow of 4.14 m³/s instead of 4.97. The latent load, not the sensible one, set the supply temperature. This is why the coil leaving condition matters as much as the airflow, as we show in the coil selection guide.
Which constraint wins
In practice you run both checks and take the more demanding result. In a dry climate the sensible load usually decides the airflow, and the supply is dry enough without effort. In a humid one, the latent load decides the supply temperature, which then decides the airflow. A good brief gives the supplier both loads, and asks them to state which one governed their selection.
Step 4: add the outdoor air
The room load is not the whole job. The ventilation air entering the unit has to be cooled and dried as well, and in a humid climate it is often the largest latent load in the building. The coil sees the mixture of outdoor and return air, and its load is the sum of the room load and the ventilation load. The ventilation airflow comes from the occupancy and the standard you follow. Then the coil is sized on the total, as in the enthalpy approach in coil selection, and the recovery options in energy recovery can cut that outdoor-air load.
Step 5: pick the unit and check the fan
- Choose a unit whose rated airflow covers the design airflow with a margin of 10 to 15% for dirty filters and uncertainty in the load.
- Check face velocity on the coil and filters at the design flow.
- Calculate the external static pressure from the duct design and add the unit’s internal losses, as in the fan power article.
- Check turndown. If the load varies widely, variable airflow or multiple smaller units will hold humidity better than one large fan at low speed.
Where this fits with NextAir
Send the room sensible and latent loads, the ventilation airflow and the design weather to our air handling unit manufacturer team, and we will propose a unit with the coil, filters and fan stated at the design point. Our guide to air handling units covers the options, and the commercial building page shows typical applications.
Sources
- NOAA. Fast Facts: highest dew points and heat index.
- Guinness World Records. Highest dewpoint temperature.
Figures and tables on this page are calculated or compiled by NextAir Systems and you are welcome to reuse them with a link back to this article.
Frequently Asked Questions
How do I calculate airflow from a cooling load?
Divide the sensible load in kW by air density times specific heat times the temperature difference between room and supply air. With about 1.2 kg/m³ and 1.006 kJ/kg·K, 1 kW at 10 K needs about 0.083 m³/s.
What supply air temperature difference should I use?
Many comfort designs use 8 to 10 K. Equipment spaces often use more. The choice trades airflow, duct size and energy against draught and condensation risk.
Why does humidity matter for airflow?
The supply air must be dry enough to absorb the room's moisture gain. A coil that meets the temperature but not the humidity leaves the room damp.
Does outdoor air affect the AHU size?
Yes. The ventilation air adds sensible and latent load at the coil, and in humid climates the latent part can be the largest single load.
Why add a margin to the airflow?
To allow for dirty filters, uncertainty in the load and unit-to-unit variation. A margin of 10 to 15% is common practice.
Talk to Our Engineering Team