A data hall is the easiest room to calculate and the least forgiving to get wrong. The load is nearly all sensible heat, the target is published, and the penalty for a failure is measured in lost service. What follows from that is a simple sizing method, and a clear view of how many units are needed once redundancy is counted.

NextAir builds air handling units from 1,000 to 30,000 CMH, with multi-unit arrangements above that for N+1 redundancy, and the largest of our standard sizes serves a section of a data hall. This page works out the airflow per megawatt and the unit count.

At a glance

  • At a 12 K temperature rise across the equipment, each megawatt of IT load needs about 248,509 m³/h of air, so a 1 MW hall needs 248,509 m³/h.
  • With 30,000 CMH units, 2 MW needs 17 units and 18 with one spare, an installed airflow of 540,000 m³/h.
  • ASHRAE TC 9.9’s recommended inlet envelope for classes A1 to A4 is 18 to 27 °C, with a dew point from -9 °C to 15 °C and a maximum of 60% RH.[1]
  • Wider temperature rises cut airflow and fan energy sharply, but depend on containment, which is a design question for the hall.

From megawatts to airflow

Nearly all the electricity a server uses becomes heat in the air, and the airflow to carry it away is the load divided by air density, specific heat and the temperature rise across the equipment. The rise is a design choice, discussed in data centre airflow, delta-T and the ASHRAE envelope. We use 12 K here for illustration.

IT load (MW)Airflow at 12 K rise (m³/h)30,000 CMH units for NUnits for N+1Installed airflow (m³/h)
0.5124,25456180,000
1248,509910300,000
2497,0181718540,000
4994,03634351,050,000

The arithmetic is general, and a real hall adds margin for growth, bypass and recirculation. It shows the scale: a 4 MW hall needs about 34 units of our largest standard size, 35 with a spare, which is why large halls are built around many smaller air handlers or a few very large custom systems. Our multi-unit arrangements share a plenum or serve separate zones, and a bank gives you redundancy, which is the point: a single failure should not take the hall down.

The supply condition

ASHRAE’s thermal guidelines recommend an inlet envelope for equipment classes A1 to A4 of 18 to 27 °C, with a dew point from -9 °C to 15 °C and a maximum of 60% RH. For class A1 the allowable range is wider, up to 32 °C and a 17 °C dew point.[1] The dew point limit matters in a hot, humid climate, because the outdoor air can carry far more moisture than that. Where the hall relies on fresh air or evaporative cooling, check the supply dew point against the limit, as explained in how much moisture an air washer adds. Where the climate is humid, a cooling coil, sometimes with a desiccant stage, is the safer arrangement.

Coil, fan and filters

The coil must be sized for the region’s peak wet-bulb conditions, not the annual average, because the worst hour is the one that matters in a hall that cannot warm up. Chilled water temperatures set how far the coil can dehumidify. The fan is the biggest electrical load in the unit, so its static pressure and efficiency deserve scrutiny, as in AHU fan power and what a pascal costs. Filtration protects the equipment from dust, which matters as much as temperature for reliability. See our data center air purification guidance.

Redundancy options

  • N+1: one spare unit across the bank, as in the table, the most common arrangement.
  • 2N: two independent systems, each able to carry the full load, for the highest availability.
  • Zoned banks: separate banks per hall section, so a fault affects one zone.
  • Maintenance: a bank lets you service one unit while the others carry the load, and a lead-lag controller rotates duty.

Think about the failure modes you are protecting against. A single air handler can fail because of a fan, a motor, a drive, a coil leak or a control fault. A bank spreads the risk across many units, but it also multiplies the number of components, so the design needs sensible isolation: dampers that close on a failed unit, a control scheme that re-balances the others and a chilled water layout that a single leak cannot take out. Ask the supplier to describe what happens, step by step, when one unit stops during peak load.

Retrofit and growth

Halls grow in stages. Ask the supplier how the plant extends: a plenum designed for additional units, a controller that adds them cleanly and a casing arrangement that lets you do it without a shutdown. For a retrofit, confirm whether the existing fan can handle the added resistance. Our factory fabricates casings and sections to follow your plant room, so connection positions and section lengths can be agreed to fit.

To compare suppliers, see how to choose an air handling unit manufacturer.

What to send us for a quotation

  • The IT load now and at full build-out, and the temperature rise across the equipment
  • The supply condition required, and the equipment class
  • Redundancy requirement: N+1, 2N or other
  • Design outdoor condition, and chilled water temperatures if used
  • Filtration requirement and the plant-room space
  • Growth plan and whether the plant must extend without shutdown

Send these to us through our contact page and we will propose a bank and its redundancy. If you already have a consultant’s design, send that too, and we will check our proposal against it and point out where our unit sizes, coil selection or fan duty differ, so the comparison is made on the same basis from the start. See the AHU range, our guide to industrial air handling units and the data centers page. Data halls in hot climates often need humidity control alongside cooling.

Sources

  1. ASHRAE TC 9.9. Thermal Guidelines for Data Processing Environments, 4th ed., Table 2.1 (2015 guidelines, SI).

Frequently Asked Questions

Do you supply AHUs for data centres?

Our AHUs run from 1,000 to 30,000 CMH in a single unit, with multi-unit arrangements above that for N+1 redundancy. The 10,000 CMH size suits a section of a data hall.

How much airflow does a data hall need per megawatt?

About 248,509 m³/h per MW at a 12 K temperature rise, from the load divided by air density, specific heat and the rise.

How many units do I need for N+1?

Divide the airflow by the unit size, round up and add one. For 2 MW at 12 K that is 17 units of 30,000 CMH and one more as the spare.

What inlet condition should the supply hold?

ASHRAE's recommended envelope for classes A1 to A4 is 18 to 27 °C, with a dew point from -9 °C to 15 °C and a maximum of 60% RH.

Can the plant grow later?

Yes, if it is designed for it. Ask for a plenum and controller that allow additional units without a shutdown.