Multi-Bank Air Washer Supplier: Several 50,000 CFM Units Serving One Hall
NextAir Systems, Faridabad, India. Last reviewed October 2026.
A large hall needs a large volume of air, and one air washer stops at 50,000 CFM. Above that, the answer is not a bigger washer but several, side by side, sharing the hall or splitting it into zones. A multi-bank arrangement is simple in principle and has a few details that decide whether it works well.
NextAir builds air washers up to 50,000 CFM (about 85,000 CMH) per unit, multi-bank arrangements above that, and custom-engineered systems beyond. A 150,000 CFM requirement, for example, is three 50,000 CFM units. This page shows the arithmetic and the questions.
At a glance
- Above 50,000 CFM we build multi-bank arrangements with several units side by side serving one hall or several zones. A 150,000 CFM requirement is three 50,000 CFM units, and beyond that, systems are custom-engineered.
- One 50,000 CFM unit evaporates about 598 litres of water an hour at 42 °C and 20% RH with 85% efficiency, so a bank of three evaporates about 1,795.
- Banks let you stage units on and off to follow the load, and take one out for cleaning while the others run.
- Water supply, drainage and distribution of air across the hall are the details that decide success at this scale.
Why banks, not one big washer
A single unit has a practical ceiling set by what can be built, shipped and installed. Beyond it, several units share the duty. That is also an advantage: units can be arranged where the heat is, staged to follow the load, and serviced one at a time. A hall served by one very large washer has one point of failure and one set of nozzles, discs or pads to clean. A bank spreads the risk and the work.
The arithmetic
The table shows four large airflows, the number of 50,000 CFM units they need, the count with one spare, and the water evaporated at 42 °C and 20% RH with 85% saturation efficiency, calculated from the psychrometrics.
| Airflow (CFM) | Airflow (CMH) | Units of 50,000 CFM | With one spare | Evaporation (litres/hour) |
|---|---|---|---|---|
| 75,000 | 127,425 | 2 | 3 | 897 |
| 100,000 | 169,900 | 2 | 3 | 1,196 |
| 150,000 | 254,850 | 3 | 4 | 1,795 |
| 250,000 | 424,750 | 5 | 6 | 2,991 |
At 250,000 CFM the plant evaporates close to three tonnes of water an hour on a hot, dry day. That has consequences for the water supply and for the water treatment, which at this scale is a project in itself: a supply line sized for the peak, storage if the mains cannot deliver it, a drainage route for the bleed-off, and a treatment plan. The consumption arithmetic is in air washer water consumption, and the management of a recirculating system in Legionella risk and ASHRAE 188.
Arranging the units
- Side by side along the wall, discharging into the hall through ducts or directly, the simplest layout for a long building.
- Zoned, with each unit serving a department, so that one can be shut down for cleaning without stopping the others.
- Sharing a plenum, where several units feed a common distribution duct, which needs careful balancing so no unit starves.
- Staged control, with units brought on as the temperature rises, so the plant follows the load and the evaporative effect is not wasted.
The right layout depends on the hall, the load and the process, and a good manufacturer will ask for the plan. Poor distribution is the commonest reason a large evaporative system disappoints: cool air in one corner and still air in another. The same airflow delivered through well-placed diffusers beats a bigger plant with bad distribution.
Redundancy deserves a practical comment at this scale. A spare unit is most useful if it can be isolated and brought into service without stopping the others, which means dampers on each unit’s inlet and outlet and a control scheme that rotates duty so the spare does not sit idle with stale water. Idle water is a hygiene risk as well as a nuisance. Ask the supplier how the spare unit is kept ready, and how its water is managed while it waits.
What does not change with scale
The climate check comes first. Evaporative cooling depends on dry air, and a bank does not make humid air dry. Look at the cooling the weather allows in wet-bulb depression, and what supply temperature to expect in saturation efficiency, before you plan the numbers. We evaluate your design conditions first, and tell you plainly if another technology suits better.
Build and delivery
Casings, frames and water tanks are fabricated and assembled in our own 30,000 sq ft facility, with MIG and TIG welding lines and 10-ton EOT cranes for moving large casings and tanks. Motors and drives are bought-out items, selected and matched to each unit. The layout, inlet and outlet positions and water connections follow your building. Our minimum lead time is 30 days, longer for multi-bank and custom systems, with the schedule given on the quotation.
Questions for a bank supplier
- How is the airflow distributed across the hall, and who designs it?
- How are the units staged, and what does the control panel show?
- How does the water supply and bleed scale, and what do you assume about treatment?
- Can one unit be isolated for cleaning while the others run?
- What happens to the plant on the worst humid day?
For a general supplier checklist, see how to choose an industrial air washer manufacturer.
What to send us for a quotation
- Hall dimensions, ceiling height and the cooling load
- Design dry-bulb and wet-bulb temperatures and the worst humid day
- The temperature and humidity the process needs
- Layout plan of the hall and where units can stand
- Water supply capacity, quality and hardness, and the drainage route
- Whether you want redundancy, and the number of zones
Send these to us through our contact page and we will propose a layout and tell you plainly if an air washer is the wrong tool for your climate. See the air washer range, our guide to industrial air washers and the warehousing page, where very large halls are common. Our Saudi Arabia notes cover Gulf conditions.
Frequently Asked Questions
What do you do above 50,000 CFM?
We build multi-bank arrangements, with several units side by side serving one hall or several zones, and custom-engineered systems beyond that.
How many units does 150,000 CFM need?
Three 50,000 CFM units. With one spare, four.
How much water does a large air washer plant use?
At 42 °C and 20% RH with 85% efficiency, a 50,000 CFM unit evaporates about 598 litres an hour, plus bleed-off, so a bank multiplies that.
Can I clean one unit while the others run?
Yes, with a bank, if the layout allows each unit to be isolated. Ask for that explicitly.
Does a bank work in a humid climate?
No better than a single unit. Evaporative cooling depends on dry air, and we evaluate your design conditions first.