How to Choose an Industrial Air Washer Manufacturer: Climate, Configuration and Water Checks
NextAir Systems, Faridabad, India. Last reviewed October 2026.
An air washer is the one product where the best manufacturer will sometimes tell you not to buy it. Evaporative cooling depends on dry air, so the first check is not about the machine at all. It is about your weather. A supplier who skips that step is selling a unit, not a solution.
Here are the checks we would run on any air washer manufacturer, including us. The figures for sizes come from our own range, which goes up to 50,000 CFM in a single unit.
At a glance
- Check your design wet-bulb temperature before anything else. Where it is high, the cooling is limited, and a good manufacturer evaluates it first and says plainly if another technology suits better.
- Our single units run up to 50,000 CFM (about 85,000 CMH), with multi-bank arrangements above that and custom designs beyond.
- Single-stage units mainly cool and remove dust; two-stage units give tighter control of humidity and air purity.
- Water is the consumable. Ask about availability, quality and hardness before you ask about price.
Check 1: does the manufacturer test your climate first?
Evaporative cooling lowers temperature by raising humidity, so it suits hot, dry climates and dusty process areas, and it is limited where the air is already humid. A supplier should ask for your design dry-bulb and wet-bulb temperatures and tell you what supply condition to expect. The table shows the cooling an 85% efficient washer can deliver in three illustrative conditions, calculated from standard psychrometric formulas.
| Condition (illustrative) | Wet-bulb (°C) | Wet-bulb depression (K) | Cooling at 85% efficiency (K) |
|---|---|---|---|
| Hot, dry (42 °C, 20% RH) | 23.3 | 18.7 | 15.9 |
| Hot, mixed (38 °C, 50% RH) | 28.6 | 9.4 | 8.0 |
| Humid coastal (35 °C, 70% RH) | 30.1 | 4.9 | 4.2 |
The spread is wide, from about 19 K of cooling in dry heat to about 4 K in coastal humidity. If a quotation promises the same supply temperature in all three, question it. The full explanation is in wet-bulb depression, and what supply temperature to expect is in saturation efficiency.
Check 2: single-stage or two-stage?
A single-stage unit mainly cools and removes dust, which suits general industrial floor cooling. A two-stage unit gives tighter control of humidity and air purity, which suits applications with tighter tolerances. The manufacturer should explain which one your process needs and why, not default to the dearer option. Our page on two-stage air washers covers the second case.
Check 3: what is in the water-contact zone?
Depending on the configuration, the water-contact zone uses rotating discs, saturated cellulose pads or atomizing nozzles. Every unit has a water reservoir with recirculation, so only the evaporated water needs replacing, and droplet eliminators that stop water leaving with the air. Ask which contact medium is proposed, what its cleaning and replacement interval is, and what the pressure drop is across it.
Check 4: how large, and how much water?
Size depends on ceiling height, the air change rate you need and the cooling load, so a supplier should size from those and not from floor area. The table shows our range in both units and the water that an air washer evaporates at 40 °C and 20% RH with 85% efficiency, calculated from the psychrometrics.
| Airflow (CFM) | Airflow (CMH) | Evaporation (litres/hour) |
|---|---|---|
| 5,000 | 8,495 | 58 |
| 10,000 | 16,990 | 116 |
| 20,000 | 33,980 | 232 |
| 40,000 | 67,960 | 463 |
| 50,000 | 84,950 | 579 |
Evaporation is only part of water use, because bleed-off adds to it, as set out in air washer water consumption. Ask the supplier for make-up water at your design condition, and what treatment they assume. Above 50,000 CFM we build multi-bank arrangements: a 150,000 CFM requirement is three 50,000 CFM units side by side.
Check 5: what does humidity do to your process?
The added moisture is the cost of the cooling. Some processes welcome it and others cannot tolerate it, a trade-off quantified in how much moisture an air washer adds. Ask the manufacturer to state the supply dew point as well as the supply temperature.
Check 6: water safety and hygiene
A recirculating system needs a water management plan. Legionella risk and ASHRAE 188 explains what is asked of owners. Ask the supplier what access there is to the reservoir and eliminators for cleaning, and what they recommend for water treatment.
A final practical test is to ask what the supplier would do if your wet-bulb figure were two degrees higher than you said. A manufacturer who has sized from your conditions will give you the new supply temperature and capacity straight away, and may suggest a coil, a pre-cooler or another technology. One who has sold from a catalogue will say it makes no difference.
Checks 7 to 10: build, lead time, energy and terms
- Build. Casings, frames and water tanks are fabricated here with MIG and TIG welding lines, so inlet and outlet positions and water connections can follow your building. Stainless steel, in SS 304 and SS 316, is available and can be combined with a two-stage unit, as on our stainless steel air washer page.
- Energy. Compare against the alternatives on a like-for-like basis, as in the energy comparison.
- Lead time. Our minimum is 30 days, with larger systems taking longer.
- Terms. Warranty, spares and the Incoterm, in writing.
What to send us for a quotation
- Design dry-bulb and wet-bulb temperatures, or the humidity, for your site
- Airflow, or the hall size, ceiling height and cooling load
- The supply temperature and humidity you need, and any tolerance
- Water availability, quality and hardness
- Whether the process needs added humidity, or cannot tolerate it
- Electrical supply and the space and layout of the building
Send these to us through our contact page and we will recommend a unit, a multi-bank system or a custom design, or tell you plainly if an air washer is the wrong tool for your climate. See our guide to industrial air washers and the air washer range. We build for textile, warehousing and metalworking plants, and our notes on Saudi Arabia cover local conditions. Where humidity is the constraint, look at dehumidifiers or an air handling unit.
Frequently Asked Questions
How do I choose an air washer manufacturer?
Check whether they test your design wet-bulb first, whether they explain single-stage versus two-stage, the contact medium, the water treatment, the size basis and the supply humidity, not just the temperature.
What is the largest single air washer you build?
Up to 50,000 CFM (about 85,000 CMH). Above that, multi-bank arrangements and custom designs.
Does an air washer work in a humid climate?
Poorly. Where the design wet-bulb temperature is high, the cooling is limited, and a manufacturer should say so.
What is the difference between single-stage and two-stage?
A single-stage unit mainly cools and removes dust. A two-stage unit gives more precise control of humidity and air purity.
How much water does an air washer use?
At 40 °C and 20% RH with 85% efficiency, about 116 litres an hour per 10,000 CFM is evaporated, plus bleed-off. It falls in more humid weather.
Talk to Our Engineering Team
Call +91-9311805618 or use our contact form for a facility-specific recommendation.